Description
This book presents the recent work regarding the different approaches developed in the framework of the joint optimization of intelligent maintenance and production strategies. The originality of these strategies is that they take various constraints into account, including production management, subcontracting environmental degradation, inspection and product quality.
Chapter
1.5. Numerical example and sensitivity study
1.5.1. Solving numerical algorithm
CHAPTER 2. JOINT OPTIMIZATION OF MAINTENANCE STRATEGIES AND
INVENTORY CONTROL – USING THE SIMULATION APPROACH
2.2. Problem description and notations
2.2.2. Definition of the suggested control strategies
2.3. Analytical study and complexity resolution
2.3.1. Formulation of the cost optimization problem
2.3.2. Complexity of the optimal control problem
2.4.2. Simulation algorithms
2.5. Optimization and numerical application
2.5.1. Comparison of ICS and CCS strategies
2.5.2. Analysis of the effect of the capacity of the final inventory (h)
2.5.3. Optimal availability
2.5.4. Finding the best compromise cost-availability: multicriteria analysis
CHAPTER 3. JOINT QUALITY CONTROL AND PREVENTIVE MAINTENANCE
STRATEGY FOR IMPERFECT PRODUCTION PROCESSES
3.2. Problem description and notations
3.3.1. The average inventory cost
3.3.2. The average maintenance cost
3.3.3. The average quality cost
3.5. Numerical example and sensitivity study
CHAPTER 4. JOINT OPTIMIZATION OF MAINTENANCE STRATEGIES AND
PRODUCTION CONTROL UNDER SUBCONTRACTING CONSTRAINTS
4.3. The joint use of internal manufacturing and subcontracting to fulfill product demand
4.3.2. Notation and data for numerical example
4.3.3. Simple maintenance policy
4.3.4. Improved maintenance policy
4.3.5. Production maintenance policy
4.3.6. Performance analysis of SMP, IMP and PMP
4.4. Production control policies under a constraint to perform subcontracting tasks
4.4.2. Simple maintenance policy
4.4.3. Integrated maintenance policy
4.4.4. Performance analysis of InMP and SMP
4.6. Appendix 1: simulation model of IMP
4.7. Appendix 2: simulation model of SMP
CHAPTER 5. JOINT OPTIMIZATION SERVICE AND MAINTENANCE
POLICIES UNDER ENVIRONMENTAL CONSTRAINTS
5.3. Problem description and notations
5.6. Numerical example and sensitivity study
5.6.1. Experiment 1: impact of Cd on (E(Ct)/E(Tc)) and δ
5.6.2. Experiment 2: impact of H on (E(Ct)/E(Tc)) and δ
5.8.1. Proof of proposition 5.2.
5.8.2. Proof of proposition 5.3.
5.8.3. Proof of proposition 5.4.