Input control in a batch production system with lead times, due dates and random yields

Author: Wang Y.   Gerchak  

Publisher: Elsevier

ISSN: 0377-2217

Source: European Journal of Operational Research, Vol.126, Iss.2, 2000-10, pp. : 371-385

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract