

Author: Farag A. S. Wang C. Cheng T. C. Zheng G. Palk B. Moon M.
Publisher: Taylor & Francis Ltd
ISSN: 1521-0502
Source: Electric Machines and Power Systems, Vol.27, Iss.3, 1999-03, pp. : 279-294
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content




Fault-location Observability Analysis on Power Distribution Systems
Electric Power Components and Systems, Vol. 42, Iss. 16, 2014-12 ,pp. :




Reliability planning for composite electric power systems
Electric Power Systems Research, Vol. 51, Iss. 1, 1999-07 ,pp. :