Author: Shen Weilin Shen Qiping Xiaoling Zhang
Publisher: Emerald Group Publishing Ltd
ISSN: 0263-2772
Source: Facilities, Vol.30, Iss.7-8, 2012-05, pp. : 302-323
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Purpose ‐ This paper introduces a building information model (BIM)-based user pre-occupancy evaluation method (UPOEM), which is applied in architectural design stage to narrow the gap between inexperienced clients and designers. It aims to improve the communication efficiency. Design/methodology/approach ‐ The literature review studied the related technologies applied in the UPOEM, which includes building information modeling, user activity scheduling, and requirements documentation method. Based on the building information model, a virtual environment involving the end-users' daily activities was built up. In this virtual environment, the clients can observe how their organization will be accommodated in the built environment according to their daily work routines. A requirements and feedback interface was designed to facilitate the clients to conduct a pre-occupancy evaluation and store the relevant information into the database. Findings ‐ In briefing and design stages, there is a considerable gap between the inexperienced clients and designers when the clients specify requirements and review the design solutions. In the UPOEM, the user activity simulation model can facilitate clients to obtain a better understanding of the design. The requirements and feedback interface can also help them specify requirements and give comments to the design. Thus it provided an alternative tool to improve the efficiency of the designer-client communication. Research limitations/implications ‐ This research established a virtual platform which involves both building information and the user activity information. This platform can be further extended by the integration of more building performance simulation tools. Thus it provided a potential to bring the traditional post occupancy evaluation process to the pre-construction stage. Practical implications ‐ The implementation of this method in practice can improve the efficiency of the designer-client communication, and also maximize the clients' satisfaction during the requirements specification and design review process. Social implications ‐ This study built up a collaborative working environment for both designer and clients. It can strengthen the designer-client relationship during the briefing and design stage. Originality/value ‐ The user activity simulation and requirements management methods are innovatively applied together to enhance the clients' performance during designer-client communication.
Related content
By Ellis Peter
Facilities, Vol. 5, Iss. 11, 1993-12 ,pp. :
Occupancy costs: a method for their estimation
By Stoy Christian Kytzia Susanne
Facilities, Vol. 24, Iss. 13-14, 2006-11 ,pp. :
A method for strategic client briefing
By Smith Jim Wyatt Ray Jackson Norm
Facilities, Vol. 21, Iss. 10, 2003-10 ,pp. :
Post-occupancy evaluation: evaluating for the future
By Ellis Peter
Facilities, Vol. 6, Iss. 1, 1993-12 ,pp. :