

Author: Davies Hilary Stevens Christopher
Publisher: Emerald Group Publishing Ltd
ISSN: 0263-080X
Source: Structural Survey, Vol.12, Iss.3, 1994-03, pp. : 4-7
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content


By Beard Alan
Civil Engineering and Environmental Systems, Vol. 21, Iss. 1, 2004-03 ,pp. :


Risk Assessment of Optimal Sidetrack Time
By Orodu O. D. Ako C. T. Craig A. J.
Petroleum Science and Technology, Vol. 31, Iss. 16, 2013-08 ,pp. :


The assessment of risk in conservation refurbishment projects
Structural Survey, Vol. 19, Iss. 5, 2001-12 ,pp. :

