Second Dolsan Bridge: A Cable-Stayed Bridge with a Concrete Edge Girder

Author: Park Dae yong   Lee Bo be  

Publisher: International Association for Bridge and Structural Engineering

ISSN: 1016-8664

Source: Structural Engineering International, Vol.22, Iss.1, 2012-02, pp. : 44-48

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract