Oxley WWTP Brisbane Australia Phase #1 Odor Control 2004 Advanced Packed Bed Wet Scrubbers Designed at 3 mps (600 fpm) Odors Eliminated with Significant Project Cost Savings

Author: Noel Leonard   Guerra Paul   Fitzgerald Kathleen   Eldridge James E.  

Publisher: Water Environment Federation

ISSN: 1938-6478

Source: Proceedings of the Water Environment Federation, Vol.2005, Iss.15, 2005-01, pp. : 1411-1440

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract

After extensive study of malodorous gases at the Oxley Creek WWTP in Brisbane, Australia, a two stage packed bed wet scrubbing system was chosen to treat the foul gases. A requirement of the system was that no significant odors be allowed to be detected beyond the property limits at maximum capacity operation. The design and operation of the two stage scrubbing system is discussed. By using the latest generation of packing product available, Q-PAC®, the system was designed to be much smaller vs. what would have been required had standard WEF recommended design practice been followed. Project savings of 50% vs. the WEF based design resulted. The odor control system has been tested extensively and is operating within all design parameters. Odors from the Oxley Creek WWTP have been eliminated as a result.