A Monte Carlo simulation to estimate TAGV production time in a stochastic flexible automated manufacturing system: a case study

Author: Fazlollahtabar Hamed   Es'haghzadeh Alireza   Hajmohammadi Hamed   Taheri-Ahangar Ali  

Publisher: Inderscience Publishers

ISSN: 1748-5037

Source: International Journal of Industrial and Systems Engineering, Vol.12, Iss.3, 2012-10, pp. : 243-258

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract