

Author: Yang Weizhou Xu Xun W.
Publisher: Inderscience Publishers
ISSN: 0952-8091
Source: International Journal of Computer Applications in Technology, Vol.42, Iss.4, 2011-03, pp. : 253-266
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Integrated process planning with scheduling is a core activity in the manufacturing chain. Modern manufacturing processes require higher flexibility and capability of supporting distributed activities. In this paper, a novel STEP-NC Compliant Process Planning and Scheduling Algorithm (STEP-NCPPSA) is proposed to meet such requirements. The STEP-NCPPSA utilises STEP-NC compliant data models to represent the related manufacturing information. STEP-NCPPSA aims to achieve an Integrated, Intelligent, Informative and Interoperable (I4) manufacturing in a distributed manufacturing environment. Three phases, STEP-NC initial process planning, initial bidding, and Tree-based Genetic Algorithm optimisation are naturally integrated by the supporting STEP-NC concepts. STEP-NCPPSA is also capable of handling shop-floor information and re-process planning and scheduling to adapt to shop floor changes.
Related content




INTEGRATING PLANNING AND SCHEDULING
Applied Artificial Intelligence, Vol. 15, Iss. 5, 2001-05 ,pp. :




Integration of PCB assembly process planning and scheduling
By Du Xuan Li Zongbin Wang Song
Assembly Automation, Vol. 31, Iss. 3, 2011-08 ,pp. :