

Author: Gilgeous Vic
Publisher: Emerald Group Publishing Ltd
ISSN: 0957-6061
Source: Integrated Manufacturing Systems, Vol.6, Iss.6, 1995-06, pp. : 23-30
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content










Improving flow to achieve lean manufacturing in shipbuilding
Production Planning and Control, Vol. 10, Iss. 2, 1999-03 ,pp. :