Author: Porter Keith Little David Kenworthy John Jarvis Peter
Publisher: Emerald Group Publishing Ltd
ISSN: 0957-6061
Source: Integrated Manufacturing Systems, Vol.7, Iss.4, 1996-04, pp. : 34-38
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
Spectral expansion solution for some finite capacity queues
By Chakka R.
Annals of Operations Research, Vol. 79, Iss. 1, 1998-01 ,pp. :
A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly
By Xiao-Feng Yin Tay-Jin Chua Feng-Yu Wang Ming-Wei Liu Tian-Xiang Cai Wen-Jing Yan Chin-Soon Chong Ju-Ping Zhu Mei-Yoke Lam
International Journal of Computer Integrated Manufacturing, Vol. 17, Iss. 8, 2004-12 ,pp. :
The Economic Lot Scheduling Problem without Capacity Constraints
Annals of Operations Research, Vol. 133, Iss. 1-4, 2005-01 ,pp. :