Simulation-Based Scheduling of Waterway
Publisher: IGI Global_journal
E-ISSN: 1947-9336|6|1|49-63
ISSN: 1947-9328
Source: International Journal of Operations Research and Information Systems (IJORIS), Vol.6, Iss.1, 2015-01, pp. : 49-63
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract