多孔分洪闸调度方案优化探讨——以洞庭湖澧南垸为例Porous Floodgate Control Optimization Study: A Case Study on Linan Poler of Dongting Lake

Author: 李志龙   毛德华  

Publisher: 汉斯出版社

ISSN: 2166-5982

Source: Journal of Water Resources Research, Vol.3, Iss.2, 2014-04, pp. : 166-177

Access to resources Favorite

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next