High-Strength Prefabricated Parallel Wire Strand for Ulsan Harbor Bridge and its Mass Production System in Korea

Author: Yoo Hoon   Seo Ju-Won   Lee Sung-Hyung   Park Young-Ho  

Publisher: International Association for Bridge and Structural Engineering

ISSN: 1016-8664

Source: Structural Engineering International, Vol.24, Iss.2, 2014-05, pp. : 293-297

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Related content