Optimization of the ULC production at CS-Chertal: start up of the revamped RH unit and working point of the RH-CC4 production line

Author: Dauchot G.   Werner A.   Joly A.   Bouhy E.   Tancrez F.   Eichert T.  

Publisher: Edp Sciences

E-ISSN: 1156-3141|99|4|349-355

ISSN: 0035-1563

Source: Revue de Métallurgie, Vol.99, Iss.4, 2010-03, pp. : 349-355

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract