Application of Three Meta-Heuristic Algorithms for Maximizing the Net Present Value of a Resource-Constrained Project Scheduling Problem with Respect to Delay Penalties

Publisher: IGI Global_journal

E-ISSN: 2155-4161|3|1|1-15

ISSN: 2155-4153

Source: International Journal of Applied Industrial Engineering (IJAIE), Vol.3, Iss.1, 2016-01, pp. : 1-15

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract