A Practical and Robust Execution Time-Frame Procedure for the Multi-Mode Resource-Constrained Project Scheduling Problem with Minimal and Maximal Time Lags

Author: Chen Angela Hsiang-Ling   Liang Yun-Chia   Padilla Jose David  

Publisher: MDPI

E-ISSN: 1999-4893|9|4|63-63

ISSN: 1999-4893

Source: Algorithms, Vol.9, Iss.4, 2016-09, pp. : 63-63

Access to resources Favorite

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract