A generalized network flow model for the multi-mode resource-constrained project scheduling problem with discounted cash flows

Publisher: Taylor & Francis Ltd

E-ISSN: 1029-0273|47|2|165-183

ISSN: 0305-215X

Source: Engineering Optimization, Vol.47, Iss.2, 2015-02, pp. : 165-183

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract