Cost impact of float loss on a project with adjustable activity durations

Author: Lo W   Kuo M-E  

Publisher: Palgrave Macmillan Ltd

ISSN: 1476-9360

Source: Journal of the Operational Research Society, Vol.64, Iss.8, 2013-08, pp. : 1147-1156

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract