Author: Chang S. Y. Chang M-R. Hong Y.
Publisher: Taylor & Francis Ltd
ISSN: 1366-5871
Source: Production Planning and Control, Vol.11, Iss.4, 2000-06, pp. : 363-368
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
An online algorithm for continuous slab caster scheduling
Production Planning and Control, Vol. 21, Iss. 3, 2010-04 ,pp. :
Continuous slab caster scheduling and interval graphs
By Lee Kangbok Chang Soo Y. Hong Yushin
Production Planning and Control, Vol. 15, Iss. 5, 2004-07 ,pp. :
Genetic algorithm for production lot planning of steel pipe
By Dawei L. Li W. Mengguang W.
Production Planning and Control, Vol. 10, Iss. 1, 1999-01 ,pp. :