Generating a backlog list for a CONWIP production line: a simulation study

Author: Leu B-Y.  

Publisher: Taylor & Francis Ltd

ISSN: 1366-5871

Source: Production Planning and Control, Vol.11, Iss.4, 2000-06, pp. : 409-418

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract