Author: Wuttipornpun Teeradej Yenradee Pisal
Publisher: Taylor & Francis Ltd
ISSN: 1366-5871
Source: Production Planning and Control, Vol.15, Iss.5, 2004-07, pp. : 534-549
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly
By Xiao-Feng Yin Tay-Jin Chua Feng-Yu Wang Ming-Wei Liu Tian-Xiang Cai Wen-Jing Yan Chin-Soon Chong Ju-Ping Zhu Mei-Yoke Lam
International Journal of Computer Integrated Manufacturing, Vol. 17, Iss. 8, 2004-12 ,pp. :