Scheduling a two-machine flowshop with travel times to minimize maximum lateness

Author: Stevens J. W.   Gemmill D. D.  

Publisher: Taylor & Francis Ltd

ISSN: 0020-7543

Source: International Journal of Production Research, Vol.35, Iss.1, 1997-01, pp. : 1-15

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract