Author: Mavridou T. Pardalos P.M. Pitsoulis L.S. Resende M.G.C.
Publisher: Elsevier
ISSN: 0377-2217
Source: European Journal of Operational Research, Vol.105, Iss.3, 1998-03, pp. : 613-621
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
A GRASP heuristic for the mixed Chinese postman problem
By Corberan A. Mart R. Sanchis J.M.
European Journal of Operational Research, Vol. 142, Iss. 1, 2002-10 ,pp. :
On solving a variation of the assignment problem
European Journal of Operational Research, Vol. 87, Iss. 1, 1995-11 ,pp. :
Multiple bottleneck assignment problem
European Journal of Operational Research, Vol. 112, Iss. 1, 1999-01 ,pp. :
The -connected assignment problem
By Poggi de Aragao M. Uchoa E.
European Journal of Operational Research, Vol. 118, Iss. 1, 1999-10 ,pp. :
A variant of time minimizing assignment problem
European Journal of Operational Research, Vol. 110, Iss. 2, 1998-10 ,pp. :