Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times

Author: Rajendran C.   Ziegler H.  

Publisher: Elsevier

ISSN: 0377-2217

Source: European Journal of Operational Research, Vol.149, Iss.3, 2003-09, pp. : 513-522

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract