Author: Chengen W. Chengbin C. Proth J.-M.
Publisher: Elsevier
ISSN: 0377-2217
Source: European Journal of Operational Research, Vol.96, Iss.3, 1997-02, pp. : 636-644
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
A new constructive heuristic for the flowshop scheduling problem
By Koulamas C.
European Journal of Operational Research, Vol. 105, Iss. 1, 1998-02 ,pp. :
The CLWS heuristic for single machine scheduling problem
By Soric K.
European Journal of Operational Research, Vol. 120, Iss. 2, 2000-01 ,pp. :
A heuristic for single machine scheduling with early and tardy costs
European Journal of Operational Research, Vol. 128, Iss. 1, 2001-01 ,pp. :
A 2-exchange heuristic for nesting problems
European Journal of Operational Research, Vol. 141, Iss. 2, 2002-09 ,pp. :