Monte Carlo stochastic simulation of electric power generation system production costs under time-dependent constraints

Author: Mazumdar M.   Chrzan L.  

Publisher: Elsevier

ISSN: 0378-7796

Source: Electric Power Systems Research, Vol.35, Iss.2, 1995-11, pp. : 101-108

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract