Failure analysis of turbo-generator of a 10 MW captive power plant

Author: Parida N.   Tarafder S.  

Publisher: Elsevier

ISSN: 1350-6307

Source: Engineering Failure Analysis, Vol.8, Iss.3, 2001-06, pp. : 303-309

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract