Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging

Author: Peter Chiu Yuanshyi  

Publisher: Taylor & Francis Ltd

ISSN: 0305-215X

Source: Engineering Optimization, Vol.35, Iss.4, 2003-08, pp. : 427-437

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract