Multiple yard cranes scheduling for loading operations in a container terminal

Author: Chen Lu  

Publisher: Taylor & Francis Ltd

ISSN: 0305-215X

Source: Engineering Optimization, Vol.43, Iss.11, 2011-11, pp. : 1205-1221

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract