Improving the flood control at a lower cost for a future Hydro-Québec hydroelectric facility on the Toulnustouc River, Canada

Author: Gaudette M   Bulota G  

Publisher: NRC Research Press

ISSN: 1208-6029

Source: Canadian Journal of Civil Engineering, Vol.30, Iss.4, 2003-08, pp. : 775-779

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract