

Author: Hotine M.
Publisher: Maney Publishing
ISSN: 1752-2706
Source: Survey Review, Vol.2, Iss.12, 1934-04, pp. : 357-367
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
The only essential difference between geodetic triangulation and any other of the fifteen “orders” of triangulation—which were once proposed, and happily rejected, at an International Conference—is that steps are taken to secure the high degree of accuracy necessary over the large areas to be covered. Some of the steps taken to secure increased accuracy may well be used to insure economy in secondary work, as for instance the use of fewer readings of a large instrument, or the use of luminous signals in conditions of poor visibility; while any surveyor may at any time have to connect his work to a geodetic triangulation, using much the same methods.
Related content


By Hotine M.
Survey Review, Vol. 2, Iss. 14, 1934-09 ,pp. :


By Hotine M.
Survey Review, Vol. 3, Iss. 16, 1935-04 ,pp. :


THE EAST AFRICAN ARC: IV. BASE MEASUREMENT
By Hotine M.
Survey Review, Vol. 3, Iss. 18, 1935-10 ,pp. :


SURVEY AND SETTING OUT OF TOWNSHIPS AND TOWNPLANNING LAY-OUTS
Survey Review, Vol. 2, Iss. 13, 1934-07 ,pp. :


THE AFRICAN ARC OF THE 30th MERIDIAN
Survey Review, Vol. 11, Iss. 82, 1951-10 ,pp. :