

Author: Gusakovskii K. Zmaznov E. Katantsev S. Mazurenko A. Mestergazi V. Prochan G. Funtikova S.
Publisher: Springer Publishing Company
ISSN: 1570-145X
Source: Power Technology and Engineering, Vol.40, Iss.1, 2006-01, pp. : 65-70
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
The experience in the installation of modern digital systems for controlling converter units at the Vyborg converter substation on the basis of advanced microprocessor devices is considered. It is shown that debugging of a control and protection system on mathematical and physical models does not guarantee optimum control of actual converter devices. Examples of advancing the control and protection system are described, the necessity for which has become obvious in tests of actual equipment. Comparison of oscillograms of processes before optimization of the control system and after its optimization and adjustment shows that the digital control system makes it possible to improve substantially the algorithms of control and protection in the short term and without changing the hardware component.
Related content








By Ermakov V.V. Kuntulov B.M. Shabal' S.V.
Hydrotechnical Construction, Vol. 37, Iss. 1, 2003-01 ,pp. :