Experience with the introduction of a pressure regulator system in the main steam line at the Krasnoyarsk TÉTs-2 plant

Author: Zhalnin D.   Shorokhov V.   Evdokimov A.   Bubnovskii O.   Churinov A.  

Publisher: Springer Publishing Company

ISSN: 1570-145X

Source: Power Technology and Engineering, Vol.44, Iss.1, 2010-05, pp. : 52-59

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract

The problems of regulating the pressure in the main steam line at coal-fired thermal electric power plants with cross links are described. A new approach to pressure regulation in the main steam line is presented. Results are shown from tests of this system at the Krasnoyarsk TÉTs-2 plant with load shedding and uptake in amounts equal to 10% of the nominal station power.