Construction of Large-Span Twin Tunnels Below a High-Rise Transmission Tower: A Case Study

Author: Wang Shuying   Yang Junsheng   Yang Yuanhong   Zhong Fangping  

Publisher: Springer Publishing Company

ISSN: 0960-3182

Source: Geotechnical and Geological Engineering, Vol.32, Iss.2, 2014-04, pp. : 453-467

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Related content