

Publisher: Karger
E-ISSN: 1423-0070|10|1|48-51
ISSN: 1420-326x
Source: Indoor and Built Environment, Vol.10, Iss.1, 2001-08, pp. : 48-51
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Standards for final clearance after lead abatement have been established for child-related facilities and public housing in the United States. For these existing standards final clearance for lead is based on surface loading. However, no standards have been suggested for buildings that are identified as not child-related or public housing (e.g. commercial buildings). Calculations have now been made to determine a proposed final clearance loading value for buildings or structures that are not child-related or public housing and for the two situations: lead-free and non-lead-free. The values proposed for floors are 1,100 µg Pb·ft–2 for lead-free buildings and 1,000 µg Pb·ft–2 for non-lead-free buildings. Blood lead levels in adults should not increase after exposure at or below these suggested lead-loading values.
Related content


Correlation between lead and cadmium concentration and semen quality
ANDROLOGIA (ELECTRONIC), Vol. 47, Iss. 8, 2015-10 ,pp. :


A Macroscopic Model for Predicting Dust Concentration Distribution in Swine Buildings
Indoor and Built Environment, Vol. 9, Iss. 3-4, 2001-01 ,pp. :




Surface and Passive Monitoring for Asbestos in an Industrial Facility
Indoor and Built Environment, Vol. 11, Iss. 6, 2003-02 ,pp. :


By Sjöström P. Tidman M. Jones I.
Scandinavian Journal of Clinical and Laboratory Investigation, Vol. 65, Iss. 2, 2005-04 ,pp. :