

Publisher: Cambridge University Press
E-ISSN: 1469-8668|3|4|221-228
ISSN: 0263-5747
Source: Robotica, Vol.3, Iss.4, 1985-10, pp. : 221-228
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Related content


A generic tool management system architecture for flexible manufacturing systems (FMS)
Robotica, Vol. 6, Iss. 3, 1988-07 ,pp. :




Planning of flexible manufacturing systems
Robotica, Vol. 3, Iss. 4, 1985-10 ,pp. :




Grouping problem in scheduling flexible manufacturing systems
Robotica, Vol. 3, Iss. 4, 1985-10 ,pp. :