

Publisher: Trans Tech Publications
E-ISSN: 1662-9779|2017|259|130-134
ISSN: 1012-0394
Source: Solid State Phenomena, Vol.2017, Iss.259, 2017-07, pp. : 130-134
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
The purpose of this article is to describe the construction of the bridge spanning the Chomutovka river valley as a part of the road I/27 bypassing the village of Velemyšleves. The investor of this project is Ředitelství silnic a dálnic ČR, správa Chomutov (Directorate for Roads and Motorways of the Czech Republic, division Chomutov). The general constructor of the entire project is the association of companies Silnice Group a.s. and AZ sanace a.s., the constructor of the foundations and the pile foundation is AZ Sanace a.s. and the constructor of the bridge is SMP CZ, a.s. The project execution documentation was carried out by the planning agency NOVÁK amp; PARTNER s.r.o. The designer and lead construction engineer of the project is Doc. Ing. Lukáš Vráblík, Ph.D.The structure is a seven-span bridge with a total length of 537 m. The load bearing structure, constructed using cantilever casting and supporting construction, consists of a seven-span continuous box girder with two frame connections. The whole structure is to be opened for public use by the end of this year.
Related content




Long-Term Monitoring of Composite Bridge across Odra River on the D47 Freeway
Key Engineering Materials, Vol. 2016, Iss. 691, 2016-06 ,pp. :




Key Engineering Materials, Vol. 2016, Iss. 722, 2017-02 ,pp. :


Dynamic Testing of Railway Truss-Bridge
Solid State Phenomena, Vol. 2015, Iss. 220, 2015-01 ,pp. :