

Publisher: Edp Sciences
E-ISSN: 2261-236x|206|issue|01015-01015
ISSN: 2261-236x
Source: MATEC Web of conference, Vol.206, Iss.issue, 2018-09, pp. : 01015-01015
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Gongbei tunnel is the key project of Hong kong-Zhuhai-macao bridge Zhuhai connecting line. The tunnel adopts frozen Curve pipe curtain digging method. In order to ensure the safety of Gongbei tunnel engineering, the rsik management of tunnel excavation team has studied. It has studied on the relevancy between on the organizational structure, rules and regulations, education and training, assessment of rewards and punishments of construction team. Then it make sure the best relevancy risk to plan the risk prevention and controlling measures. Finally, the safety management strategy has targeted to the Excavation team. After practical application, the excavation team of Gongbei tunnel has achieved all-round and focused risk management, which has guided the implementation of the excavation work.
Related content


A Design and Construction of a Wind Tunnel for Engineering Laboratories
MATEC Web of conference, Vol. 192, Iss. issue, 2018-08 ,pp. :


Security risk analysis and management
MATEC Web of conference, Vol. 178, Iss. issue, 2018-07 ,pp. :




Occupational health and safety risk management
MATEC Web of conference, Vol. 184, Iss. issue, 2018-07 ,pp. :


Main directions of the development of the risk management system in corporations
MATEC Web of conference, Vol. 212, Iss. issue, 2018-10 ,pp. :