Construction of Temporary Accommodation Camp and Selection of Optimal Type of Building

Publisher: Trans Tech Publications

E-ISSN: 1662-7482|2015|725|105-110

ISSN: 1660-9336

Source: Applied Mechanics and Materials, Vol.2015, Iss.725, 2015-03, pp. : 105-110

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract

Surveys performed nationwide show that mobile temporary accommodation camps are being manufactured by more than 200 specialized enterprises (without considering the minor manufacturers) acting under different ministries and agencies. According to the analysis performed, today 26 basic mobile structural systems consisting of 18 conveyor-type and 8 demountable-type systems are being used on a national basis. Today national manufacturers are producing more than 250 types of container-type buildings and facilities which differ in functionality, capacity, climatic category, price and other technical-and-economic indexes. Use of mobile accommodation complexes is characterized by certain advantages. Basic criterion for mobile accommodation camp construction consists in its timely commissioning. Basic predicted indexes affecting the cost of temporary accommodation camp could serve as an endorsement of the forwarded standpoint.