

Author: Kingsman B. Hendry L.
Publisher: Taylor & Francis Ltd
ISSN: 1366-5871
Source: Production Planning and Control, Vol.13, Iss.7, 2002-10, pp. : 579-590
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Workload control (WLC) systems can be seen as a natural extension of inputoutput control systems which allow both the control of jobs into the shop and the control of capacity which affects the flow of finished goods out of the shop. In previous research, it has been shown that WLC can help to reduce manufacturing lead times, even if the total workload processed by the shop in a given time period is maintained at a constant rate. However, the relative contributions of the input control mechanisms versus the output control mechanisms have not been clearly determined. This paper seeks to explore this which affects the flow of finished goods out of the shop. In previous research, it has been shown that WLC can help to reduce manufacturing lead times, even if the total workload processed by the shop in a given time period is maintained at a constant rate. However, the relative contributions of the input control mechanisms versus the output control mechanisms have not been clearly determined. This paper seeks to explore this issue using a simulation of a real job shop, in which the WLC system that has been developed at Lancaster University is used. It explores the use of input control alone and the use of input control plus output control. In addition, the relation between workload and various performance measures, such as lead time, queueing time and capacity utilisation, is explored. The results of the experiments show that one should consider input control and output control as two levers of control that are both to be pulled rather than relying on the single lever of stopping the input when the WIP reaches some preset level.
Related content


By Moreira Maria do RosÁrio Alves Alves Rui Alberto F.S.
International Journal of Computational Science and Engineering, Vol. 7, Iss. 3, 2012-07 ,pp. :





