Tool replacement for production with a low fraction of defectives

Author: Pearn W. L.  

Publisher: Taylor & Francis Ltd

ISSN: 0020-7543

Source: International Journal of Production Research, Vol.44, Iss.12, 2006-06, pp. : 2313-2326

Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.

Previous Menu Next

Abstract

In manufacturing industry, the tool replacement cost is, in many cases, a significant portion of the production cost. Early tool replacement increases the production cost. Overdue tool replacement, however, results in poor production quality. Accordingly, improving production quality while maintaining a low production cost is essential. The index C pk is regarded as a yield-based index. For a fixed C pk value, the production yield and fraction of defectives can be calculated. In this paper, we present an analytical approach using C pk to determine the optimal tool replacement time. An accurate process capability must be calculated, particularly when the data contain assignable cause variation. Tool wear is a dominant and inseparable component in many machining processes (a systematic assignable cause), and ordinary capability measures become inaccurate because process data are contaminated by the assignable cause variation. Considering process capability changes dynamically, an estimator of C pk is investigated. The closed form of the exact sampling distribution is derived. An effective tool management procedure for determining the optimal tool replacement time is presented for processes with a low fraction of defectives. For illustrative purposes, an application example involving tool wear is presented.