

Author: Sana Shib Sankar
Publisher: Taylor & Francis Ltd
ISSN: 0020-7543
Source: International Journal of Production Research, Vol.50, Iss.23, 2012-12, pp. : 6763-6774
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
This paper deals with an imperfect production system with allowable shortages due to regular preventive maintenance for products sold with free minimal repair warranty. Preventive maintenance is an essential factor of the just-in-time structure that results in a shutdown of the production process for a certain period of time. During such an interruption, a buffer stock is needed to adjust the market demand. The study includes the possibility of imperfect production and determines the optimum buffer level and production run time by trading off the holding cost, shortage cost, rework cost, repair cost for warranty, labour/energy costs, material cost and cost for maintenance so that the cost per unit product is minimised.
Related content






Joint optimal inventory control and preventive maintenance policy
By Rezg N.
International Journal of Production Research, Vol. 46, Iss. 19, 2008-10 ,pp. :




By Chelbi A.
International Journal of Production Research, Vol. 46, Iss. 19, 2008-10 ,pp. :