Author: Koulamas C.
Publisher: Elsevier
ISSN: 0377-2217
Source: European Journal of Operational Research, Vol.106, Iss.1, 1998-04, pp. : 95-100
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
A bicriteria two-machine permutation flowshop problem
By Sivrikaya-Serifoglu F. Ulusoy G.
European Journal of Operational Research, Vol. 107, Iss. 2, 1998-06 ,pp. :
Two-machine flowshop scheduling with availability constraints
By Lee C.-Y.
European Journal of Operational Research, Vol. 114, Iss. 2, 1999-04 ,pp. :
Two-machine flow-shop scheduling to minimize total late work
By Lin B.
Engineering Optimization, Vol. 38, Iss. 4, 2006-06 ,pp. :
Minimizing tardy jobs in a flowshop with common due date
By Della Croce F. Gupta J.N.D. Tadei R.
European Journal of Operational Research, Vol. 120, Iss. 2, 2000-01 ,pp. :