Author: Sayin S. Karabati S.
Publisher: Elsevier
ISSN: 0377-2217
Source: European Journal of Operational Research, Vol.113, Iss.2, 1999-03, pp. : 435-449
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
Two-machine flow-shop scheduling to minimize total late work
By Lin B.
Engineering Optimization, Vol. 38, Iss. 4, 2006-06 ,pp. :
A bicriteria two-machine permutation flowshop problem
By Sivrikaya-Serifoglu F. Ulusoy G.
European Journal of Operational Research, Vol. 107, Iss. 2, 1998-06 ,pp. :
Minimizing functions of infeasibilities in a two-machine flow shop
European Journal of Operational Research, Vol. 121, Iss. 2, 2000-03 ,pp. :