Author: Sun X. Morizawa K. Nagasawa H.
Publisher: Elsevier
ISSN: 0377-2217
Source: European Journal of Operational Research, Vol.146, Iss.3, 2003-05, pp. : 498-516
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
Two-machine flow-shop scheduling to minimize total late work
By Lin B.
Engineering Optimization, Vol. 38, Iss. 4, 2006-06 ,pp. :