

Author: Arango H.G. de Souza A.C.Z. Lambert-Torres G. Alves da Silva A.P.
Publisher: Elsevier
ISSN: 0378-7796
Source: Electric Power Systems Research, Vol.56, Iss.1, 2000-10, pp. : 35-41
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content


A time-based load shedding protection for isolated power systems
Electric Power Systems Research, Vol. 52, Iss. 2, 1999-11 ,pp. :


Unit commitment using load forecasting based on artificial neural networks
Electric Power Systems Research, Vol. 32, Iss. 3, 1995-03 ,pp. :



