Author: Parameswaran P. Raghunathan V.S. Hiremath S.C. Paknikar K.R.
Publisher: Elsevier
ISSN: 1350-6307
Source: Engineering Failure Analysis, Vol.10, Iss.4, 2003-08, pp. : 395-404
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
Engineering Failure Analysis, Vol. 9, Iss. 2, 2002-04 ,pp. :
Torsional failure of a wire rope mooring line during installation in deep water
By Chaplin C.R.
Engineering Failure Analysis, Vol. 6, Iss. 2, 1999-04 ,pp. :
Failure analysis of a mine hoist rope
Engineering Failure Analysis, Vol. 4, Iss. 1, 1997-03 ,pp. :
Failure mechanisms in wire ropes
By Chaplin C.R.
Engineering Failure Analysis, Vol. 2, Iss. 1, 1995-03 ,pp. :
Bending fatigue tests on a metallic wire rope for aircraft rescue hoists
Engineering Failure Analysis, Vol. 10, Iss. 2, 2003-04 ,pp. :