Author: Chen C.K.
Publisher: Elsevier
ISSN: 1350-6307
Source: Engineering Failure Analysis, Vol.9, Iss.2, 2002-04, pp. : 185-190
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
Analysis of a vehicle crankshaft failure
By Silva F.S.
Engineering Failure Analysis, Vol. 10, Iss. 5, 2003-10 ,pp. :
Failure analysis of a ceramic bidet
By Tait R.B.
Engineering Failure Analysis, Vol. 3, Iss. 3, 1996-09 ,pp. :
Failure analysis of a mast column
By Lee J.-H. You W.-D. Kim J.-W. Choi J.-H. Choe B.-H.
Engineering Failure Analysis, Vol. 10, Iss. 3, 2003-06 ,pp. :
Failure analysis of gas turbine buckets
By Chang J.-C. Yun Y.-H. Choi C. Kim J.-C.
Engineering Failure Analysis, Vol. 10, Iss. 5, 2003-10 ,pp. :