Author: Armstrong M Galli A Razanatsimba R
Publisher: Maney Publishing
ISSN: 1474-9009
Source: Mining Technology, Vol.121, Iss.3, 2012-09, pp. : 125-131
Disclaimer: Any content in publications that violate the sovereignty, the constitution or regulations of the PRC is not accepted or approved by CNPIEC.
Abstract
Related content
By Albor Consuegra F. R. Dimitrakopoulos R.
Mining Technology, Vol. 118, Iss. 2, 2009-06 ,pp. :
Optimisation of a stochastic rock fracture model using Markov Chain Monte Carlo simulation
Mining Technology, Vol. 122, Iss. 3, 2013-09 ,pp. :
Optimisation of stope limits using a heuristic approach
Mining Technology, Vol. 113, Iss. 2, 2004-06 ,pp. :
Simultaneous optimisation of stope layouts and long term production schedules
Mining Technology, Vol. 120, Iss. 3, 2011-09 ,pp. :